We haven’t completely moved into our newly finished bathroom. But finished it finally is After 3 years! All the work – Me and Brian (mostly Brian) and my uncle Uno helped with sheetrock and friend Karel helped gutting. We only hired a plumber to do the pipes.
Before & After
So we totally gutted the place..We gained extra space by using a built-in cabinet from the room next to the bathroom. We insulated the walls, covered with plastic, sheetrocked, spackled, painted, installed tile on the floor, installed a tub, Brian built a box around the tub, also a drawer on wheels for storage. Brian did all electric wiring and built “floating shelves”. We tiled the box and the walls, new sink from Ikea.
Before
AfterMirror from the Thrift Store $2.99
After